In the 1950s, a method called Material Requirements Planning (or “MRP”) changed the world of manufacturing forever. But times have changed—customer tolerance times are shorter, product variety and complexity has increased, and supply chains have spread around the world.  MRP is dramatically failing in this “New Normal.”       Demand Driven Material Requirements Planning (DDMRP), Version 2...
Despite spending enormous sums on technology and improvement methods, most businesses are under siege.  The inability to drive adaptation to an increasingly more volatile, uncertain, complex, and ambiguous (“VUCA”) set of circumstances has resulted in an unprecedented rate of failure across organizations of all shapes and sizes. Worse yet, the necessary component to break the cycle is being distorted by antiquated models, methods, rules, and tools held over from...
In the 1950s, a method called Material Requirements Planning (or “MRP”) changed the world of manufacturing forever. But times have changed—customer tolerance times are shorter, product variety and complexity has increased, and supply chains have spread around the world.  MRP is dramatically failing in this “New Normal.”  Demand Driven Material Requirements Planning (DDMRP), Version 3 presents a practical, proven, and emerging...
In the 1950s, a planning method was conceived called “Material Requirements Planning (or MRP).” MRP changed the world of manufacturing forever. But times have changed—customer tolerance times are much shorter, product variety and complexity has increased, and supply chains have spread around the world. MRP is dramatically failing in this “New Normal.”  Demand Driven Material Requirements Planning (DDMRP) is a practical, proven, and...